The Natural Energy Company in Dundee
20+ yrs
Experience
60 km
Service radius
1-10
Employees
Profile information
About The Natural Energy Company
Fife and Dundee solar PV and heat pump specialists with nearly 20 years of Scottish renewables experience
Dundee, DD6 8AF
Dundee DD6 8AF
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review The Natural Energy Company!
Frequently Asked Questions
How do I get a quote from The Natural Energy Company?
You can request a quote through the form on this page or contact The Natural Energy Company directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does The Natural Energy Company serve?
The Natural Energy Company is based in Dundee and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does The Natural Energy Company hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does The Natural Energy Company offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask The Natural Energy Company for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask The Natural Energy Company for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does The Natural Energy Company handle permits and paperwork?
The exact scope is not verified on this profile. Ask The Natural Energy Company which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from The Natural Energy Company
Send your project details to request follow-up from The Natural Energy Company. Response timing and consultation terms are set by the company.
For The Natural Energy Company
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
The Natural Energy Company