Namaste Solar in Denver
21+ yrs
Experience
14000+
Projects
100 km
Service radius
201-500
Employees
Profile information
About Namaste Solar
Colorado's largest employee-owned solar company with 20+ years of experience and 14,000+ projects completed
Denver, Colorado 80204
Denver, Colorado 80204
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Namaste Solar!
Frequently Asked Questions
How do I get a quote from Namaste Solar?
You can request a quote through the form on this page or contact Namaste Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Namaste Solar serve?
Namaste Solar is based in Denver and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Namaste Solar hold?
This profile lists the following reported certifications: NABCEP, B Corp Certified, SEIA Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Namaste Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Namaste Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Namaste Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Namaste Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Namaste Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Namaste Solar
Send your project details to request follow-up from Namaste Solar. Response timing and consultation terms are set by the company.
For Namaste Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Namaste Solar