N

Naked Solar Exeter in Exeter

Exeter·Solar Installation
ResidentialCommercial

16+ yrs

Experience

80 km

Service radius

51-200

Employees

Profile information

83%
Contact details0%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Naked Solar Exeter

Award-winning South West solar installer with Exeter hub — B Corp, Tesla Premium Certified since 2010

Exeter, EX2 7LD

Exeter EX2 7LD

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSRECCNICEICB Corp

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPowerREC

Inverters

SolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

ExeterPlymouthTauntonDorchesterYeovil

Customer Reviews

No reviews yet. Be the first to review Naked Solar Exeter!

Write a Review

Frequently Asked Questions

How do I get a quote from Naked Solar Exeter?

You can request a quote through the form on this page or contact Naked Solar Exeter directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Naked Solar Exeter serve?

Naked Solar Exeter is based in Exeter and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Naked Solar Exeter hold?

This profile lists the following reported certifications: MCS, RECC, NICEIC, B Corp. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Naked Solar Exeter offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Naked Solar Exeter for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Naked Solar Exeter for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Naked Solar Exeter handle permits and paperwork?

The exact scope is not verified on this profile. Ask Naked Solar Exeter which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2010
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Naked Solar Exeter

Send your project details to request follow-up from Naked Solar Exeter. Response timing and consultation terms are set by the company.

For Naked Solar Exeter

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
N

Naked Solar Exeter

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.