M

Midsouth Solar Pros in Memphis

Memphis, Tennessee·Solar Installation
ResidentialCommercial
0

120 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Midsouth Solar Pros

Full-service Memphis solar installer serving Tennessee, Mississippi, and Arkansas with residential and commercial solar solutions

Memphis, Tennessee 38119

Memphis, Tennessee 38119

Services Offered

Solar InstallationBattery Storage

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Memphis, TennesseeGermantown, TennesseeBartlett, TennesseeCollierville, TennesseeSouthaven, TennesseeOlive Branch, Tennessee

Customer Reviews

No reviews yet. Be the first to review Midsouth Solar Pros!

Write a Review

Frequently Asked Questions

How do I get a quote from Midsouth Solar Pros?

You can request a quote through the form on this page or contact Midsouth Solar Pros directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Midsouth Solar Pros serve?

Midsouth Solar Pros is based in Memphis and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Midsouth Solar Pros hold?

This profile does not list independently verified certifications. Ask Midsouth Solar Pros for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Midsouth Solar Pros offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Midsouth Solar Pros for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Midsouth Solar Pros for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Midsouth Solar Pros handle permits and paperwork?

The exact scope is not verified on this profile. Ask Midsouth Solar Pros which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

0
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Midsouth Solar Pros

Send your project details to request follow-up from Midsouth Solar Pros. Response timing and consultation terms are set by the company.

For Midsouth Solar Pros

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

Midsouth Solar Pros

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.