M

Manchester Renewables

Manchester · Solar Installation
Residential Commercial
0

2 reviews

5.0 avg rating

50 km

Service radius

2-10

Employees

5.0
2 reviews
0

SurgePV Score

6.4 / 10
Customer Reviews 100%
Certifications 75%
Experience 0%
Services Range 60%
Warranty Coverage 100%
Online Presence 50%

About Manchester Renewables

Local family-run Manchester solar installer with MCS and RECC accreditation and TrustMark registration

Manchester, SK8 1DR

Manchester SK8 1DR

Services Offered

Solar Installation Battery Storage Maintenance

Certifications

MCS RECC TrustMark

Warranty Coverage

25yr

Panel Warranty

10yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Manchester Cheadle Stockport Salford Trafford Bury Oldham

Customer Reviews

5.0

2 reviews

5
2
4
0
3
0
2
0
1
0
Verified Customer Verified
Oct 1, 2024

The whole process was really smooth and the team very reliable. Jordan from the initial visit was really honest and friendly and the installation itself was done to a very high standard.

Verified Customer Verified
Jul 15, 2024

I don't think I've ever had better service from a company. Absolutely true to their word and took real pride in their work. Fantastic service.

Write a Review

Frequently Asked Questions

How do I get a quote from Manchester Renewables?

You can request a free quote by filling out the form on this page or contacting Manchester Renewables directly via phone or email. Most installers provide a free initial consultation and site assessment.

What areas does Manchester Renewables serve?

Manchester Renewables is based in Manchester and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Manchester Renewables hold?

Manchester Renewables holds the following certifications: MCS, RECC, TrustMark. These certifications ensure compliance with industry standards and local regulations.

What warranty does Manchester Renewables offer?

Manchester Renewables offers 25-year panel warranty, 10-year installation workmanship warranty. Specific terms may vary by product and project.

How long does installation take?

Most residential solar installations are completed within 1-3 days after permits are approved. The full timeline from consultation to activation typically ranges from 4-12 weeks depending on local permitting and utility interconnection processes.

Does Manchester Renewables handle permits and paperwork?

Yes, most solar installers including Manchester Renewables handle all necessary permits, utility interconnection applications, and incentive paperwork as part of their service. Confirm specific details during your consultation.

Business Details

0
Employees 2-10
Profile Status Unclaimed
Verification Level 0/6
Profile Complete 70%

Trust Score

4.7 / 5.0

Based on verified reviews, certifications, and business history.

Get a Free Quote from Manchester Renewables

Fill out the form below and Manchester Renewables will contact you within 24-48 hours.

For Manchester Renewables

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
M

Manchester Renewables

5.0 (2)
Get a Free Quote