K

KS Connexions in Coventry

Coventry·Solar Installation
ResidentialCommercialIndustrial

9+ yrs

Experience

50 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About KS Connexions

MCS-accredited renewable energy experts with over a decade of experience, serving Coventry and Warwickshire from Leamington Spa

Coventry, CV32 5LA

Coventry CV32 5LA

Services Offered

Solar InstallationBattery StorageEV ChargingMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNAPIT

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

CoventryLeamington SpaWarwickKenilworthStratford-upon-AvonRugby

Customer Reviews

No reviews yet. Be the first to review KS Connexions!

Write a Review

Frequently Asked Questions

How do I get a quote from KS Connexions?

You can request a quote through the form on this page or contact KS Connexions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does KS Connexions serve?

KS Connexions is based in Coventry and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does KS Connexions hold?

This profile lists the following reported certifications: MCS, NAPIT. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does KS Connexions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask KS Connexions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask KS Connexions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does KS Connexions handle permits and paperwork?

The exact scope is not verified on this profile. Ask KS Connexions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2017
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from KS Connexions

Send your project details to request follow-up from KS Connexions. Response timing and consultation terms are set by the company.

For KS Connexions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
K

KS Connexions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.