JCO Solar in Baton Rouge
5+ yrs
Experience
80 km
Service radius
1-10
Employees
Profile information
About JCO Solar
Locally owned Louisiana solar contractor specializing in residential and commercial solar with battery backup
Baton Rouge, Louisiana 70726
Baton Rouge, Louisiana 70726
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review JCO Solar!
Frequently Asked Questions
How do I get a quote from JCO Solar?
You can request a quote through the form on this page or contact JCO Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does JCO Solar serve?
JCO Solar is based in Baton Rouge and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does JCO Solar hold?
This profile lists the following reported certifications: Louisiana Licensed Contractor (72777), Sol-Ark Certified Installer, Lion Energy Certified Installer, IronRidge Certified Installer, Storz Power Certified Installer, Lumin Certified Installer, NABCEP Certified (Lion Energy). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does JCO Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask JCO Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask JCO Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does JCO Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask JCO Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from JCO Solar
Send your project details to request follow-up from JCO Solar. Response timing and consultation terms are set by the company.
For JCO Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
JCO Solar