J-Tech Construction & Solar in Omaha
22+ yrs
Experience
120 km
Service radius
11-50
Employees
Profile information
About J-Tech Construction & Solar
BBB-accredited Omaha solar and construction company with over 20 years in business
Omaha, Nebraska 68144
Omaha, Nebraska 68144
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review J-Tech Construction & Solar!
Frequently Asked Questions
How do I get a quote from J-Tech Construction & Solar?
You can request a quote through the form on this page or contact J-Tech Construction & Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does J-Tech Construction & Solar serve?
J-Tech Construction & Solar is based in Omaha and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does J-Tech Construction & Solar hold?
This profile lists the following reported certifications: BBB Accredited (since 2010). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does J-Tech Construction & Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask J-Tech Construction & Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask J-Tech Construction & Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does J-Tech Construction & Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask J-Tech Construction & Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from J-Tech Construction & Solar
Send your project details to request follow-up from J-Tech Construction & Solar. Response timing and consultation terms are set by the company.
For J-Tech Construction & Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
J-Tech Construction & Solar