Island Pacific Energy in Honolulu
19+ yrs
Experience
60 km
Service radius
11-50
Employees
Profile information
About Island Pacific Energy
Locally owned Honolulu solar company providing personalized solar and battery solutions since 2007
Honolulu, Hawaii 96813
Honolulu, Hawaii 96813
Services Offered
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Island Pacific Energy!
Frequently Asked Questions
How do I get a quote from Island Pacific Energy?
You can request a quote through the form on this page or contact Island Pacific Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Island Pacific Energy serve?
Island Pacific Energy is based in Honolulu and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Island Pacific Energy hold?
This profile does not list independently verified certifications. Ask Island Pacific Energy for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Island Pacific Energy offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Island Pacific Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Island Pacific Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Island Pacific Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask Island Pacific Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Island Pacific Energy
Send your project details to request follow-up from Island Pacific Energy. Response timing and consultation terms are set by the company.
For Island Pacific Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Island Pacific Energy