Ion Solar Pros in Hartford
9+ yrs
Experience
2000+
Projects
160 km
Service radius
51-200
Employees
Profile information
About Ion Solar Pros
Connecticut-founded solar installer with offices in Hartford, Middlebury, and Stamford serving the entire Northeast
Hartford, Connecticut 06106
Hartford, Connecticut 06106
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Ion Solar Pros!
Frequently Asked Questions
How do I get a quote from Ion Solar Pros?
You can request a quote through the form on this page or contact Ion Solar Pros directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Ion Solar Pros serve?
Ion Solar Pros is based in Hartford and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Ion Solar Pros hold?
This profile lists the following reported certifications: NABCEP, CT Green Bank Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Ion Solar Pros offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Ion Solar Pros for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Ion Solar Pros for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Ion Solar Pros handle permits and paperwork?
The exact scope is not verified on this profile. Ask Ion Solar Pros which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Ion Solar Pros
Send your project details to request follow-up from Ion Solar Pros. Response timing and consultation terms are set by the company.
For Ion Solar Pros
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Ion Solar Pros