I

Inty Power in Scottsdale

Scottsdale, Arizona·Solar Installation
ResidentialCommercial

10+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Inty Power

Published directory profile for Inty Power in Scottsdale. Verify services, credentials, ratings, and references directly with their original sources.

Scottsdale, Arizona 85284

Scottsdale, Arizona 85284

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedTesla Powerwall Authorized Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Scottsdale, ArizonaPhoenix, ArizonaTempe, ArizonaMesa, ArizonaGilbert, ArizonaChandler, Arizona

Customer Reviews

No reviews yet. Be the first to review Inty Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Inty Power?

You can request a quote through the form on this page or contact Inty Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Inty Power serve?

Inty Power is based in Scottsdale and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Inty Power hold?

This profile lists the following reported certifications: BBB Accredited, Tesla Powerwall Authorized Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Inty Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Inty Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Inty Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Inty Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Inty Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2016
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Inty Power

Send your project details to request follow-up from Inty Power. Response timing and consultation terms are set by the company.

For Inty Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Inty Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.