I

IntegrateSun in Denver

Denver, Colorado·Solar Installation
ResidentialCommercial

16+ yrs

Experience

7000+

Projects

120 km

Service radius

51-200

Employees

Profile information

83%
Contact details0%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About IntegrateSun

Multi-state solar installer with 37 years of experience and 7,000+ completed projects across 12 states

Denver, Colorado 80203

Denver, Colorado 80203

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditMonitoringGrid ConnectionCommercial Solar

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECSilfabCanadian SolarQ Cells

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Denver, ColoradoAurora, ColoradoLakewood, ColoradoLittleton, ColoradoArvada, ColoradoWestminster, ColoradoBoulder, ColoradoFort Collins, ColoradoColorado Springs, ColoradoCentennial, Colorado

Customer Reviews

No reviews yet. Be the first to review IntegrateSun!

Write a Review

Frequently Asked Questions

How do I get a quote from IntegrateSun?

You can request a quote through the form on this page or contact IntegrateSun directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does IntegrateSun serve?

IntegrateSun is based in Denver and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does IntegrateSun hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does IntegrateSun offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask IntegrateSun for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask IntegrateSun for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does IntegrateSun handle permits and paperwork?

The exact scope is not verified on this profile. Ask IntegrateSun which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2010
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from IntegrateSun

Send your project details to request follow-up from IntegrateSun. Response timing and consultation terms are set by the company.

For IntegrateSun

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

IntegrateSun

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.