Independent Power Systems in Aurora
30+ yrs
Experience
100 km
Service radius
11-50
Employees
Profile information
About Independent Power Systems
Boulder-based solar pioneer since 1996 offering solar, battery storage, EV chargers, and heat pumps across Colorado
Aurora, Colorado 80301
Aurora, Colorado 80301
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Independent Power Systems!
Frequently Asked Questions
How do I get a quote from Independent Power Systems?
You can request a quote through the form on this page or contact Independent Power Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Independent Power Systems serve?
Independent Power Systems is based in Aurora and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Independent Power Systems hold?
This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Independent Power Systems offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Independent Power Systems for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Independent Power Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Independent Power Systems handle permits and paperwork?
The exact scope is not verified on this profile. Ask Independent Power Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Independent Power Systems
Send your project details to request follow-up from Independent Power Systems. Response timing and consultation terms are set by the company.
For Independent Power Systems
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Independent Power Systems