I

Independent Energy Hawaii in Honolulu

Honolulu, Hawaii·Solar Installation
Residential

8+ yrs

Experience

60 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Independent Energy Hawaii

Published directory profile for Independent Energy Hawaii in Honolulu. Verify services, credentials, ratings, and references directly with their original sources.

Honolulu, Hawaii 96814

Honolulu, Hawaii 96814

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+ Rated

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECPanasonic

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Honolulu, HawaiiKailua, HawaiiKaneohe, HawaiiPearl City, HawaiiAiea, HawaiiHawaii Kai, Hawaii

Customer Reviews

No reviews yet. Be the first to review Independent Energy Hawaii!

Write a Review

Frequently Asked Questions

How do I get a quote from Independent Energy Hawaii?

You can request a quote through the form on this page or contact Independent Energy Hawaii directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Independent Energy Hawaii serve?

Independent Energy Hawaii is based in Honolulu and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Independent Energy Hawaii hold?

This profile lists the following reported certifications: BBB A+ Rated. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Independent Energy Hawaii offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Independent Energy Hawaii for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Independent Energy Hawaii for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Independent Energy Hawaii handle permits and paperwork?

The exact scope is not verified on this profile. Ask Independent Energy Hawaii which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2018
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Independent Energy Hawaii

Send your project details to request follow-up from Independent Energy Hawaii. Response timing and consultation terms are set by the company.

For Independent Energy Hawaii

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Independent Energy Hawaii

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.