I

Icon Solar in Lexington

Lexington, Kentucky·Solar Installation
ResidentialCommercial

17+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Icon Solar

Kentucky's top-ranked residential solar installer with 16 years of experience serving Lexington homeowners and businesses

Lexington, Kentucky 40505

Lexington, Kentucky 40505

Services Offered

Solar InstallationBattery StorageMonitoring

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Lexington, KentuckyLouisville, KentuckyGeorgetown, KentuckyNicholasville, KentuckyRichmond, KentuckyFrankfort, Kentucky

Customer Reviews

No reviews yet. Be the first to review Icon Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Icon Solar?

You can request a quote through the form on this page or contact Icon Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Icon Solar serve?

Icon Solar is based in Lexington and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Icon Solar hold?

This profile does not list independently verified certifications. Ask Icon Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Icon Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Icon Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Icon Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Icon Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Icon Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Icon Solar

Send your project details to request follow-up from Icon Solar. Response timing and consultation terms are set by the company.

For Icon Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Icon Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.