H

Harmon Solar in Phoenix

Phoenix, Arizona·Solar Installation
ResidentialCommercial

51+ yrs

Experience

80 km

Service radius

51-100

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Harmon Solar

Second-generation family-owned solar installer serving Arizona since 1975

Phoenix, Arizona 85027

Phoenix, Arizona 85027

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoringRoof AssessmentEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+ AccreditedNABCEPROC Licensed

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPowerRECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Phoenix, ArizonaScottsdale, ArizonaTempe, ArizonaMesa, ArizonaChandler, ArizonaGlendale, ArizonaPeoria, ArizonaSurprise, ArizonaGilbert, Arizona

Customer Reviews

No reviews yet. Be the first to review Harmon Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Harmon Solar?

You can request a quote through the form on this page or contact Harmon Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Harmon Solar serve?

Harmon Solar is based in Phoenix and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Harmon Solar hold?

This profile lists the following reported certifications: BBB A+ Accredited, NABCEP, ROC Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Harmon Solar offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Harmon Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Harmon Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Harmon Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Harmon Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded1975
Employees51-100
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Harmon Solar

Send your project details to request follow-up from Harmon Solar. Response timing and consultation terms are set by the company.

For Harmon Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
H

Harmon Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.