Haleakala Solar & Roofing in Honolulu
49+ yrs
Experience
80 km
Service radius
51-200
Employees
Profile information
About Haleakala Solar & Roofing
Published directory profile for Haleakala Solar & Roofing in Honolulu. Verify services, credentials, ratings, and references directly with their original sources.
Honolulu, Hawaii 96701
Honolulu, Hawaii 96701
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Haleakala Solar & Roofing!
Frequently Asked Questions
How do I get a quote from Haleakala Solar & Roofing?
You can request a quote through the form on this page or contact Haleakala Solar & Roofing directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Haleakala Solar & Roofing serve?
Haleakala Solar & Roofing is based in Honolulu and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Haleakala Solar & Roofing hold?
This profile lists the following reported certifications: BBB A+ Rated, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Haleakala Solar & Roofing offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Haleakala Solar & Roofing for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Haleakala Solar & Roofing for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Haleakala Solar & Roofing handle permits and paperwork?
The exact scope is not verified on this profile. Ask Haleakala Solar & Roofing which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Haleakala Solar & Roofing
Send your project details to request follow-up from Haleakala Solar & Roofing. Response timing and consultation terms are set by the company.
For Haleakala Solar & Roofing
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Haleakala Solar & Roofing