G

Greenify Energy Savers in Salt Lake City

Salt Lake City, Utah·Solar Installation
Residential

14+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Greenify Energy Savers

Family-owned whole-home energy efficiency and solar installer serving the Salt Lake City area since 2012

Salt Lake City, Utah 84070

Salt Lake City, Utah 84070

Services Offered

Solar InstallationBattery StorageEnergy AuditMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Salt Lake City, UtahSandy, UtahMidvale, UtahWest Jordan, UtahSouth Jordan, UtahDraper, UtahMurray, UtahTaylorsville, Utah

Customer Reviews

No reviews yet. Be the first to review Greenify Energy Savers!

Write a Review

Frequently Asked Questions

How do I get a quote from Greenify Energy Savers?

You can request a quote through the form on this page or contact Greenify Energy Savers directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Greenify Energy Savers serve?

Greenify Energy Savers is based in Salt Lake City and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Greenify Energy Savers hold?

This profile lists the following reported certifications: BBB A+. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Greenify Energy Savers offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Greenify Energy Savers for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Greenify Energy Savers for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Greenify Energy Savers handle permits and paperwork?

The exact scope is not verified on this profile. Ask Greenify Energy Savers which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2012
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Greenify Energy Savers

Send your project details to request follow-up from Greenify Energy Savers. Response timing and consultation terms are set by the company.

For Greenify Energy Savers

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Greenify Energy Savers

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.