Green Sun Energy Services in Newark
16+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Green Sun Energy Services
New Jersey's trusted provider of solar energy systems, generators, EV chargers, and roofing services since 2010
Newark, New Jersey 07102
Newark, New Jersey 07102
Services Offered
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Green Sun Energy Services!
Frequently Asked Questions
How do I get a quote from Green Sun Energy Services?
You can request a quote through the form on this page or contact Green Sun Energy Services directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Green Sun Energy Services serve?
Green Sun Energy Services is based in Newark and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Green Sun Energy Services hold?
This profile does not list independently verified certifications. Ask Green Sun Energy Services for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Green Sun Energy Services offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Green Sun Energy Services for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Green Sun Energy Services for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Green Sun Energy Services handle permits and paperwork?
The exact scope is not verified on this profile. Ask Green Sun Energy Services which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Green Sun Energy Services
Send your project details to request follow-up from Green Sun Energy Services. Response timing and consultation terms are set by the company.
For Green Sun Energy Services
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Green Sun Energy Services