G

Green Building Renewables (Daventry) in Northampton

Northampton·Solar Installation
ResidentialCommercial

10+ yrs

Experience

60 km

Service radius

51-200

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Green Building Renewables (Daventry)

Award-winning MCS certified solar, battery storage, heat pump, and EV charger installer covering Northampton and Daventry

Northampton, NN11 8RB

Northampton NN11 8RB

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSRECCNICEICTrustMark

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

NorthamptonDaventryLeicesterMilton KeynesBrackleyLeamington SpaBanbury

Customer Reviews

No reviews yet. Be the first to review Green Building Renewables (Daventry)!

Write a Review

Frequently Asked Questions

How do I get a quote from Green Building Renewables (Daventry)?

You can request a quote through the form on this page or contact Green Building Renewables (Daventry) directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Green Building Renewables (Daventry) serve?

Green Building Renewables (Daventry) is based in Northampton and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Green Building Renewables (Daventry) hold?

This profile lists the following reported certifications: MCS, RECC, NICEIC, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Green Building Renewables (Daventry) offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Green Building Renewables (Daventry) for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Green Building Renewables (Daventry) for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Green Building Renewables (Daventry) handle permits and paperwork?

The exact scope is not verified on this profile. Ask Green Building Renewables (Daventry) which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2016
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Green Building Renewables (Daventry)

Send your project details to request follow-up from Green Building Renewables (Daventry). Response timing and consultation terms are set by the company.

For Green Building Renewables (Daventry)

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Green Building Renewables (Daventry)

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.