G

Great Basin Solar in Reno

Reno, Nevada·Solar Installation
ResidentialCommercial

8+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Great Basin Solar

NABCEP-certified Reno solar installer with 35+ years combined experience and 3 NABCEP certifications

Reno, Nevada 89503

Reno, Nevada 89503

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP Certified (3 certifications)Nevada Contractor License (0083677)ICC Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

REC

Inverters

EnphaseSolarEdge

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Reno, NevadaSparks, NevadaCarson City, NevadaFernley, Nevada

Customer Reviews

No reviews yet. Be the first to review Great Basin Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Great Basin Solar?

You can request a quote through the form on this page or contact Great Basin Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Great Basin Solar serve?

Great Basin Solar is based in Reno and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Great Basin Solar hold?

This profile lists the following reported certifications: NABCEP Certified (3 certifications), Nevada Contractor License (0083677), ICC Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Great Basin Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Great Basin Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Great Basin Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Great Basin Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Great Basin Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2018
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Great Basin Solar

Send your project details to request follow-up from Great Basin Solar. Response timing and consultation terms are set by the company.

For Great Basin Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Great Basin Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.