Fresh Electrical Solar
10+ yrs
Experience
549 reviews
4.0 avg rating
80 km
Service radius
51-200
Employees
SurgePV Score
About Fresh Electrical Solar
One of the UK's largest solar installation companies with 4-star Trustpilot rating and 549 reviews, based in Basildon
Basildon, SS14 3DB
Basildon SS14 3DB
Services Offered
Certifications
Partner Manufacturers
Panels
Warranty Coverage
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
View all 549 reviews →549 reviews
Punctual, efficient and informative throughout the whole process. The team explained everything about the system and the installation was completed neatly and on time.
Frequently Asked Questions
How do I get a quote from Fresh Electrical Solar?
You can request a free quote by filling out the form on this page or contacting Fresh Electrical Solar directly via phone or email. Most installers provide a free initial consultation and site assessment.
What areas does Fresh Electrical Solar serve?
Fresh Electrical Solar is based in Basildon and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Fresh Electrical Solar hold?
Fresh Electrical Solar holds the following certifications: MCS, RECC. These certifications ensure compliance with industry standards and local regulations.
What warranty does Fresh Electrical Solar offer?
Fresh Electrical Solar offers 25-year panel warranty, 10-year installation workmanship warranty. Specific terms may vary by product and project.
How long does installation take?
Most residential solar installations are completed within 1-3 days after permits are approved. The full timeline from consultation to activation typically ranges from 4-12 weeks depending on local permitting and utility interconnection processes.
Does Fresh Electrical Solar handle permits and paperwork?
Yes, most solar installers including Fresh Electrical Solar handle all necessary permits, utility interconnection applications, and incentive paperwork as part of their service. Confirm specific details during your consultation.
Business Details
Trust Score
Based on verified reviews, certifications, and business history.
Get a Free Quote from Fresh Electrical Solar
Fill out the form below and Fresh Electrical Solar will contact you within 24-48 hours.
For Fresh Electrical Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Fresh Electrical Solar