F

Freedom Solar Power in Charlotte

Charlotte, North Carolina·Solar Installation
ResidentialCommercial

19+ yrs

Experience

10000+

Projects

150 km

Service radius

201-500

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Freedom Solar Power

SunPower Master Dealer with 281+ MW installed and a dedicated Charlotte office serving the Carolinas

Charlotte, North Carolina 28206

Charlotte, North Carolina 28206

Services Offered

Solar InstallationBattery StorageSolar DesignCommercial SolarMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower Master DealerNABCEPTesla Powerwall Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Charlotte, North CarolinaConcord, North CarolinaGastonia, North CarolinaHuntersville, North CarolinaMatthews, North CarolinaMooresville, North CarolinaRock Hill, North CarolinaIndian Trail, North Carolina

Customer Reviews

No reviews yet. Be the first to review Freedom Solar Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Freedom Solar Power?

You can request a quote through the form on this page or contact Freedom Solar Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Freedom Solar Power serve?

Freedom Solar Power is based in Charlotte and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Freedom Solar Power hold?

This profile lists the following reported certifications: SunPower Master Dealer, NABCEP, Tesla Powerwall Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Freedom Solar Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Freedom Solar Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Freedom Solar Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Freedom Solar Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Freedom Solar Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees201-500
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Freedom Solar Power

Send your project details to request follow-up from Freedom Solar Power. Response timing and consultation terms are set by the company.

For Freedom Solar Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
F

Freedom Solar Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.