E

Excited Energy in Denver

Denver, Colorado·Solar Installation
ResidentialCommercial

17+ yrs

Experience

120 km

Service radius

11-50

Employees

Profile information

67%
Contact details0%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Excited Energy

No-pressure solar advocates offering 30-minute online design consultations across the Colorado Front Range

Denver, Colorado 80538

Denver, Colorado 80538

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditMonitoringMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECSilfabCanadian Solar

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Denver, ColoradoLoveland, ColoradoFort Collins, ColoradoBoulder, ColoradoLongmont, ColoradoGreeley, ColoradoBroomfield, ColoradoArvada, ColoradoWestminster, ColoradoThornton, Colorado

Customer Reviews

No reviews yet. Be the first to review Excited Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Excited Energy?

You can request a quote through the form on this page or contact Excited Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Excited Energy serve?

Excited Energy is based in Denver and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Excited Energy hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Excited Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Excited Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Excited Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Excited Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Excited Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete67%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Excited Energy

Send your project details to request follow-up from Excited Energy. Response timing and consultation terms are set by the company.

For Excited Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Excited Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.