E

ES Solar in Salt Lake City

Salt Lake City, Utah·Solar Installation
ResidentialCommercial

17+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About ES Solar

Published directory profile for ES Solar in Salt Lake City. Verify services, credentials, ratings, and references directly with their original sources.

Salt Lake City, Utah 84104

Salt Lake City, Utah 84104

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoringSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB A+SolarEdge Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SolarEdge

Inverters

SolarEdge

Batteries

Sonnen

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Salt Lake City, UtahLayton, UtahOgden, UtahProvo, UtahPark City, UtahSandy, UtahWest Jordan, UtahDraper, Utah

Customer Reviews

No reviews yet. Be the first to review ES Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from ES Solar?

You can request a quote through the form on this page or contact ES Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does ES Solar serve?

ES Solar is based in Salt Lake City and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does ES Solar hold?

This profile lists the following reported certifications: NABCEP, BBB A+, SolarEdge Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does ES Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask ES Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask ES Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does ES Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask ES Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from ES Solar

Send your project details to request follow-up from ES Solar. Response timing and consultation terms are set by the company.

For ES Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.