E

Energy-tec in Salisbury

Salisbury·Solar Installation
ResidentialCommercial

13+ yrs

Experience

50 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Energy-tec

Award-winning Salisbury-based renewable energy specialists with 30 years combined experience

Salisbury,

Salisbury

Services Offered

Solar InstallationBattery StorageMaintenanceEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCS

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

SalisburyAndoverAmesburyShaftesburyBlandford ForumWinchester

Customer Reviews

No reviews yet. Be the first to review Energy-tec!

Write a Review

Frequently Asked Questions

How do I get a quote from Energy-tec?

You can request a quote through the form on this page or contact Energy-tec directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Energy-tec serve?

Energy-tec is based in Salisbury and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Energy-tec hold?

This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Energy-tec offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Energy-tec for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Energy-tec for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Energy-tec handle permits and paperwork?

The exact scope is not verified on this profile. Ask Energy-tec which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2013
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Energy-tec

Send your project details to request follow-up from Energy-tec. Response timing and consultation terms are set by the company.

For Energy-tec

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Energy-tec

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.