E

Energy Gain UK in Manchester

Manchester·Solar Installation
CommercialIndustrial

18+ yrs

Experience

2600+

Projects

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Energy Gain UK

Award-winning commercial solar specialists based in Trafford Park with over 2,600 renewable energy projects since 2008

Manchester, M17 1HW

Manchester M17 1HW

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceMonitoringEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSRECCNICEIC

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

ManchesterTraffordSalfordStockportBoltonLiverpool

Customer Reviews

No reviews yet. Be the first to review Energy Gain UK!

Write a Review

Frequently Asked Questions

How do I get a quote from Energy Gain UK?

You can request a quote through the form on this page or contact Energy Gain UK directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Energy Gain UK serve?

Energy Gain UK is based in Manchester and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Energy Gain UK hold?

This profile lists the following reported certifications: MCS, RECC, NICEIC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Energy Gain UK offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Energy Gain UK for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Energy Gain UK for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Energy Gain UK handle permits and paperwork?

The exact scope is not verified on this profile. Ask Energy Gain UK which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Energy Gain UK

Send your project details to request follow-up from Energy Gain UK. Response timing and consultation terms are set by the company.

For Energy Gain UK

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Energy Gain UK

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.