E

Emerald Energy in Durham

Durham, North Carolina·Solar Installation
ResidentialCommercialOff-Grid

17+ yrs

Experience

150 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Emerald Energy

Top EnergySage contractor in North Carolina for 16 years — fully licensed general and electrical contractor

Durham, North Carolina 27615

Durham, North Carolina 27615

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedNC General Contractor LicenseNC Electrical Contractor License

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Enphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Durham, North CarolinaRaleigh, North CarolinaCary, North CarolinaChapel Hill, North CarolinaApex, North Carolina

Customer Reviews

No reviews yet. Be the first to review Emerald Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Emerald Energy?

You can request a quote through the form on this page or contact Emerald Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Emerald Energy serve?

Emerald Energy is based in Durham and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Emerald Energy hold?

This profile lists the following reported certifications: NABCEP Certified, NC General Contractor License, NC Electrical Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Emerald Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Emerald Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Emerald Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Emerald Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Emerald Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2009
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Emerald Energy

Send your project details to request follow-up from Emerald Energy. Response timing and consultation terms are set by the company.

For Emerald Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Emerald Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.