E

Edison Solar in Cleveland

Cleveland, Ohio·Solar Installation
ResidentialCommercialIndustrial

19+ yrs

Experience

150 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Edison Solar

Northern Ohio's leading solar installation and distribution company since 2007 — residential and commercial systems

Cleveland, Ohio 44846

Cleveland, Ohio 44846

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Canadian SolarQcellsTrinaJinko

Inverters

EnphaseSMAFronius

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Cleveland, OhioSandusky, OhioLorain, OhioElyria, OhioMilan, Ohio

Customer Reviews

No reviews yet. Be the first to review Edison Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Edison Solar?

You can request a quote through the form on this page or contact Edison Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Edison Solar serve?

Edison Solar is based in Cleveland and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Edison Solar hold?

This profile lists the following reported certifications: NABCEP Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Edison Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Edison Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Edison Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Edison Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Edison Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Edison Solar

Send your project details to request follow-up from Edison Solar. Response timing and consultation terms are set by the company.

For Edison Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Edison Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.