E

EDGE Energy in Baltimore

Baltimore, Maryland·Solar Installation
ResidentialCommercial

20+ yrs

Experience

5000+

Projects

120 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About EDGE Energy

Vertically integrated Maryland electrification specialist with 5,000+ completed projects since 2006, serving DC, MD, and VA

Baltimore, Maryland 20705

Baltimore, Maryland 20705

Services Offered

Solar InstallationSolar DesignBattery StorageEV Chargingheat_pumpinsulationMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedNABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Enphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Baltimore, MarylandBeltsville, MarylandColumbia, MarylandSilver Spring, MarylandRockville, MarylandAnnapolis, MarylandWashington DC, Maryland

Customer Reviews

No reviews yet. Be the first to review EDGE Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from EDGE Energy?

You can request a quote through the form on this page or contact EDGE Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does EDGE Energy serve?

EDGE Energy is based in Baltimore and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does EDGE Energy hold?

This profile lists the following reported certifications: BBB Accredited, NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does EDGE Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask EDGE Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask EDGE Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does EDGE Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask EDGE Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2006
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from EDGE Energy

Send your project details to request follow-up from EDGE Energy. Response timing and consultation terms are set by the company.

For EDGE Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

EDGE Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.