D

Distributive Solar in Nashville

Nashville, Tennessee·Solar Installation
ResidentialCommercial

8+ yrs

Experience

200 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Distributive Solar

Nashville-based solar provider serving residential, commercial, and agricultural clients across the Mid-South

Nashville, Tennessee 37228

Nashville, Tennessee 37228

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Canadian Solar

Inverters

SolarEdgeEnphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Nashville, TennesseeFranklin, TennesseeMurfreesboro, TennesseeClarksville, TennesseeHendersonville, TennesseeCookeville, Tennessee

Customer Reviews

No reviews yet. Be the first to review Distributive Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Distributive Solar?

You can request a quote through the form on this page or contact Distributive Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Distributive Solar serve?

Distributive Solar is based in Nashville and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Distributive Solar hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Distributive Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Distributive Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Distributive Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Distributive Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Distributive Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2018
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Distributive Solar

Send your project details to request follow-up from Distributive Solar. Response timing and consultation terms are set by the company.

For Distributive Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
D

Distributive Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.