Custom Solar and Leisure in Tucson
19+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Custom Solar and Leisure
NABCEP-certified Tucson solar expert since 2007 with BBB A+ accreditation and Angie's List Super Service awards
Tucson, Arizona 85711
Tucson, Arizona 85711
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Custom Solar and Leisure!
Frequently Asked Questions
How do I get a quote from Custom Solar and Leisure?
You can request a quote through the form on this page or contact Custom Solar and Leisure directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Custom Solar and Leisure serve?
Custom Solar and Leisure is based in Tucson and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Custom Solar and Leisure hold?
This profile lists the following reported certifications: NABCEP, BBB A+ Accredited, ROC Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Custom Solar and Leisure offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Custom Solar and Leisure for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Custom Solar and Leisure for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Custom Solar and Leisure handle permits and paperwork?
The exact scope is not verified on this profile. Ask Custom Solar and Leisure which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Custom Solar and Leisure
Send your project details to request follow-up from Custom Solar and Leisure. Response timing and consultation terms are set by the company.
For Custom Solar and Leisure
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Custom Solar and Leisure