C

Creative Solar USA in Birmingham

Birmingham, Alabama·Solar Installation
ResidentialCommercial

18+ yrs

Experience

250 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Creative Solar USA

BBB-accredited NABCEP-certified solar installer serving Alabama since 2008 with 25-year production guarantees

Birmingham, Alabama 30144

Birmingham, Alabama 30144

Services Offered

Solar InstallationBattery StorageSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Birmingham, AlabamaHoover, AlabamaTuscaloosa, AlabamaAnniston, AlabamaGadsden, AlabamaAtlanta, AlabamaKennesaw, Alabama

Customer Reviews

No reviews yet. Be the first to review Creative Solar USA!

Write a Review

Frequently Asked Questions

How do I get a quote from Creative Solar USA?

You can request a quote through the form on this page or contact Creative Solar USA directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Creative Solar USA serve?

Creative Solar USA is based in Birmingham and serves within a 250 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Creative Solar USA hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Creative Solar USA offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Creative Solar USA for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Creative Solar USA for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Creative Solar USA handle permits and paperwork?

The exact scope is not verified on this profile. Ask Creative Solar USA which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Creative Solar USA

Send your project details to request follow-up from Creative Solar USA. Response timing and consultation terms are set by the company.

For Creative Solar USA

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Creative Solar USA

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.