Cotswold Energy Group in Cheltenham
8+ yrs
Experience
80 km
Service radius
51-200
Employees
Profile information
About Cotswold Energy Group
Gloucestershire's multi-million pound renewable energy specialist — solar, heat pumps and insulation
Cheltenham,
Cheltenham
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Cotswold Energy Group!
Frequently Asked Questions
How do I get a quote from Cotswold Energy Group?
You can request a quote through the form on this page or contact Cotswold Energy Group directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Cotswold Energy Group serve?
Cotswold Energy Group is based in Cheltenham and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Cotswold Energy Group hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Cotswold Energy Group offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Cotswold Energy Group for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Cotswold Energy Group for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Cotswold Energy Group handle permits and paperwork?
The exact scope is not verified on this profile. Ask Cotswold Energy Group which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Cotswold Energy Group
Send your project details to request follow-up from Cotswold Energy Group. Response timing and consultation terms are set by the company.
For Cotswold Energy Group
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Cotswold Energy Group