B

Bone Dry Solar in Indianapolis

Indianapolis, Indiana·Solar Installation
ResidentialCommercial

4+ yrs

Experience

120 km

Service radius

51-200

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Bone Dry Solar

Indianapolis's most reputable local solar company, backed by 30+ years of home improvement excellence from the Bone Dry family

Indianapolis, Indiana 46268

Indianapolis, Indiana 46268

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenanceRoof Assessment

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Battery CertifiedTesla Solar Roof CertifiedOwens Corning Approved

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Indianapolis, IndianaCarmel, IndianaFishers, IndianaNoblesville, IndianaGreenwood, IndianaLafayette, IndianaFort Wayne, IndianaEvansville, Indiana

Customer Reviews

No reviews yet. Be the first to review Bone Dry Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Bone Dry Solar?

You can request a quote through the form on this page or contact Bone Dry Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Bone Dry Solar serve?

Bone Dry Solar is based in Indianapolis and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Bone Dry Solar hold?

This profile lists the following reported certifications: Tesla Battery Certified, Tesla Solar Roof Certified, Owens Corning Approved. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Bone Dry Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Bone Dry Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Bone Dry Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Bone Dry Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Bone Dry Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2022
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Bone Dry Solar

Send your project details to request follow-up from Bone Dry Solar. Response timing and consultation terms are set by the company.

For Bone Dry Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Bone Dry Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.