B

Blue Raven Solar in Fort Collins

Fort Collins, Colorado·Solar Installation
Residential

12+ yrs

Experience

200 km

Service radius

201-500

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Blue Raven Solar

National solar installer with a dedicated Fort Collins office, installing Tier 1 monocrystalline panels since 2014

Fort Collins, Colorado 80526

Fort Collins, Colorado 80526

Services Offered

Solar InstallationBattery StorageSolar DesignGrid ConnectionMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+ RatingColorado Electrical Contractor License

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

MaxeonRECQcellsTrinaJinko

Inverters

Enphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Fort Collins, ColoradoDenver, ColoradoBoulder, ColoradoColorado Springs, ColoradoLoveland, ColoradoGreeley, Colorado

Customer Reviews

No reviews yet. Be the first to review Blue Raven Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Blue Raven Solar?

You can request a quote through the form on this page or contact Blue Raven Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Blue Raven Solar serve?

Blue Raven Solar is based in Fort Collins and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Blue Raven Solar hold?

This profile lists the following reported certifications: BBB A+ Rating, Colorado Electrical Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Blue Raven Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Blue Raven Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Blue Raven Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Blue Raven Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Blue Raven Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2014
Employees201-500
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Blue Raven Solar

Send your project details to request follow-up from Blue Raven Solar. Response timing and consultation terms are set by the company.

For Blue Raven Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Blue Raven Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.