Black Platinum Solar & Electric in Phoenix
19+ yrs
Experience
1500+
Projects
80 km
Service radius
11-50
Employees
Profile information
About Black Platinum Solar & Electric
Family-owned solar installer with 1,500+ installations and no subcontractors since 2007
Phoenix, Arizona 85020
Phoenix, Arizona 85020
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Black Platinum Solar & Electric!
Frequently Asked Questions
How do I get a quote from Black Platinum Solar & Electric?
You can request a quote through the form on this page or contact Black Platinum Solar & Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Black Platinum Solar & Electric serve?
Black Platinum Solar & Electric is based in Phoenix and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Black Platinum Solar & Electric hold?
This profile lists the following reported certifications: BBB Accredited, ROC Licensed, Panasonic Authorized Installer, Enphase Authorized Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Black Platinum Solar & Electric offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Black Platinum Solar & Electric for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Black Platinum Solar & Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Black Platinum Solar & Electric handle permits and paperwork?
The exact scope is not verified on this profile. Ask Black Platinum Solar & Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Black Platinum Solar & Electric
Send your project details to request follow-up from Black Platinum Solar & Electric. Response timing and consultation terms are set by the company.
For Black Platinum Solar & Electric
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Black Platinum Solar & Electric