A

AEC Solar in Albany

Albany, New York·Solar Installation
ResidentialCommercial

35+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About AEC Solar

SunPower Master Dealer and NABCEP certified installer providing solar and energy solutions in Albany since 1991

Albany, New York 12203

Albany, New York 12203

Services Offered

Solar InstallationBattery StorageSolar DesignMonitoringMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPSEIA MemberSunPower Master DealerNYSERDA Approved

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPowerMaxeonREC

Inverters

EnphaseSolarEdgeSMA

Batteries

Tesla PowerwallGenerac

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Albany, New YorkSchenectady, New YorkTroy, New YorkSaratoga Springs, New YorkClifton Park, New YorkLatham, New York

Customer Reviews

No reviews yet. Be the first to review AEC Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from AEC Solar?

You can request a quote through the form on this page or contact AEC Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does AEC Solar serve?

AEC Solar is based in Albany and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does AEC Solar hold?

This profile lists the following reported certifications: NABCEP, SEIA Member, SunPower Master Dealer, NYSERDA Approved. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does AEC Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask AEC Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask AEC Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does AEC Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask AEC Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1991
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from AEC Solar

Send your project details to request follow-up from AEC Solar. Response timing and consultation terms are set by the company.

For AEC Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

AEC Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.