8

8MSolar in Durham

Durham, North Carolina·Solar Installation
ResidentialCommercial

11+ yrs

Experience

120 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About 8MSolar

Award-winning NC solar installer with NABCEP-certified team — 2025 and 2026 EnergySage Local Installer of the Year

Durham, North Carolina 27705

Durham, North Carolina 27705

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedBBB A+Enphase Certified InstallerTesla Powerwall CertifiedSolarEdge Preferred Partner

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECQcellsSunPower

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ BatteryGenerac PWRcellFortress Power

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Durham, North CarolinaRaleigh, North CarolinaCary, North CarolinaChapel Hill, North CarolinaWake Forest, North Carolina

Customer Reviews

No reviews yet. Be the first to review 8MSolar!

Write a Review

Frequently Asked Questions

How do I get a quote from 8MSolar?

You can request a quote through the form on this page or contact 8MSolar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does 8MSolar serve?

8MSolar is based in Durham and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does 8MSolar hold?

This profile lists the following reported certifications: NABCEP Certified, BBB A+, Enphase Certified Installer, Tesla Powerwall Certified, SolarEdge Preferred Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does 8MSolar offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask 8MSolar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask 8MSolar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does 8MSolar handle permits and paperwork?

The exact scope is not verified on this profile. Ask 8MSolar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from 8MSolar

Send your project details to request follow-up from 8MSolar. Response timing and consultation terms are set by the company.

For 8MSolar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.