Residential Solar

Residential Solar Design Software for Installers Who Sell More

Design complete residential solar systems in under 10 minutes with SurgePV's solar design software. AI roof modeling, accurate shade analysis, and branded proposals help installers close more homeowners in less time.

Residential solar design software interface showing 3D roof modeling

<10 min

Average residential design time

0%

Faster than manual drafting

0+

Countries supported

0+

Solar companies using SurgePV

01 AI Roof Modeling

Auto-Generate 3D Roof Models in 60 Seconds

Stop tracing rooflines by hand. SurgePV's AI detects roof planes, ridges, valleys, and obstructions from satellite imagery — then builds a precise 3D model automatically. Whether you are designing for a single-family home, townhouse, or multi-family building, the model is ready for panel placement in about a minute.

Automatic Roof Plane Detection

AI identifies pitch, azimuth, and usable area for each roof face. No manual measurements or CAD imports required.

Obstruction Recognition

Chimneys, vents, skylights, and dormers are detected and routed around automatically with code-compliant setbacks.

Multi-Roof & Complex Geometry

Hip roofs, gables, L-shaped layouts, and multi-plane structures are handled in a single project without switching tools.

AI-powered 3D residential roof modeling in SurgePV
Residential solar shade analysis and irradiance mapping
02 Shading & Irradiance

Accurate Shade Analysis and Production Estimates

Homeowners buy on confidence. SurgePV runs hourly shade simulations using 3D site geometry, tree lines, and neighboring buildings so every production estimate is grounded in real-world conditions.

Hourly Shading Simulation

Calculate shade losses for every hour of the year. Identify the modules that underperform and adjust layout before installation.

Irradiance & Temperature Maps

Visualize solar access across the roof with color-coded irradiance maps and temperature-adjusted production curves.

Field-Validated Accuracy

Production estimates are validated within ±3% of actual meter data for residential sites, reducing post-install disputes.

03 Proposals & Sales

Branded Client Proposals Straight From Design

Turn any residential design into a solar proposal that sells. SurgePV auto-populates system specs, production charts, financing scenarios, and payback analysis into a branded document homeowners can understand and sign.

1 Click

Proposal generation

PDF + Link

Client delivery

Financing

Cash, loan, lease, PPA

E-Sign Ready

Close faster

Branded residential solar proposal generated in SurgePV
Use Cases

Residential Projects SurgePV Handles

From detached homes to retrofit additions, SurgePV adapts to the full range of residential solar work.

Single-Family Homes

Design pitched and flat-roof homes with fast AI modeling, accurate shade analysis, and homeowner-friendly proposals.

Townhouses

Handle shared walls, limited roof area, and HOA requirements with compact layouts and clear setback rules.

Multi-Family Buildings

Model apartment rooftops, allocate production across units, and generate proposals for landlords and property managers.

Retrofit & Addition

Add panels to existing systems, model roof additions, and re-run production estimates for expansion projects.

Comparison

SurgePV vs Aurora Solar vs OpenSolar

See how SurgePV compares to other residential solar design platforms on the features installers use every day.

Feature SurgePV Aurora Solar OpenSolar
AI 3D roof modeling 60 seconds AI-assisted, manual refinement Manual roof drawing
Residential design time Under 10 minutes 20–40 minutes 30–60 minutes
Shade analysis Built-in 3D hourly Built-in 3D hourly Basic 2D shading
Branded proposals One-click PDF + link Proposal tool available Built-in proposal editor
Pricing model Project-based, no seat limits Per-seat subscription Free core, paid add-ons
Battery storage design Included Add-on Limited
Onboarding & support Free training, same-day support Paid onboarding tiers Community + email

Read the full solar design software comparison to see detailed feature breakdowns.

What Solar Professionals Say

We went from 45 minutes per residential design to under 10. The AI roof detection is the closest thing to magic I have seen in solar software.

MC

Marcus Chen

Lead Designer, SunPath Installers, San Diego · 25-person team

"Our proposal close rate jumped 22% after switching to SurgePV. Homeowners understand the visuals immediately."

ER

Elena Rossi

Sales Manager, SolarItalia, Milan

"The shade accuracy is spot on. We stopped getting post-install production complaints entirely."

TB

Tom Brennan

Project Engineer, BrightRoof Solar, Dublin

"SurgePV replaced two tools and cut our software spend by 40%."

PN

Priya Nair

Operations Director, EcoSun Solutions, Bangalore

What is residential solar design software?

Residential solar design software helps installers model photovoltaic systems for homes. SurgePV combines AI roof modeling, shade analysis, production simulation, and proposal generation in one platform.

How does SurgePV speed up residential design?

AI generates a 3D roof model in about 60 seconds. Auto-placement optimizes panel layout instantly. Production and financial estimates update in real time, cutting total design time to under 10 minutes.

Why choose SurgePV for residential projects?

SurgePV is faster, more affordable per project, and easier to learn than legacy tools. It includes solar proposal software, shade analysis, and battery design without add-on fees.

Frequently Asked Questions

What is residential solar design software?

Residential solar design software is a digital platform that helps installers model rooftop PV systems for single-family homes, townhouses, and multi-family buildings. SurgePV combines AI roof modeling, shade analysis, production simulation, and branded proposal generation in one cloud-based tool.

How fast can I design a residential solar system in SurgePV?

Most residential designs are completed in under 10 minutes. AI roof modeling generates a 3D site model in about 60 seconds, auto-placement optimizes panel layout instantly, and production estimates update in real time as you adjust the design.

Does SurgePV handle shading analysis for residential roofs?

Yes. SurgePV runs hourly shade simulations using 3D roof geometry, nearby trees, chimneys, and neighboring buildings. The output includes an irradiance map, shade loss percentage, and month-by-month production adjustments.

Can SurgePV generate client-ready residential proposals?

Yes. SurgePV turns any residential design into a branded proposal with system specs, energy production charts, financing options, and payback analysis. Proposals can be exported as PDF or shared via a client-facing link.

What roof types does SurgePV support for residential projects?

SurgePV supports pitched shingle roofs, tile roofs, metal roofs, flat roofs, hip roofs, and complex multi-plane geometries. The AI detects ridges, valleys, dormers, and obstructions automatically.

Is SurgePV suitable for small installer businesses?

Yes. SurgePV is built for installer teams of all sizes, from solo operators to national dealers. The cloud-based pricing scales with project volume, and onboarding typically takes less than a day.

How accurate are SurgePV production estimates for homes?

SurgePV production estimates are validated within ±3% of post-install meter data for residential sites. The engine uses location-specific weather files, module temperature coefficients, and hourly shading losses.

Can I design battery storage with residential solar in SurgePV?

Yes. SurgePV includes battery sizing and backup modeling for residential systems. You can compare self-consumption, time-of-use, and backup-power scenarios alongside the solar design.

Design More. Sell More. Build More.

Join 500+ solar companies who saw SurgePV in action and never went back to their old tools.