You've Used the Tools.
Now See How They Work Together.
The calculators you've been using do one thing well. In this demo, you'll see what happens when system sizing, shading analysis, financial modeling, and proposals connect into a single workflow — from first address to signed contract, without switching tabs or re-entering numbers. Solar teams run 60% faster because nothing falls through the cracks between steps.
What you'll see in your demo
Every tool you've tested handles one piece of the job. Here's what the whole picture looks like:
AI roof modeling on your actual project
Share an address - we'll model it live in under 60 seconds
Shading analysis and energy simulation
See bankable P50/P75/P90 reports generated instantly
Branded proposals that close deals
From design to client-ready proposal in one workflow
Financial modeling and ROI calculations
NPV, IRR, payback periods - numbers your clients trust
"After the demo, I signed up immediately. SurgePV cut our design time from 4 hours to under 45 minutes. We went from 8 designs a week to 30."
James Okafor, Lead Designer
SunTech Installations, Lagos · 15-person team
Book Your Personalized Demo
Takes 30 seconds. We'll reach out within 1 business hour.
No commitment required · 20-min personalized walkthrough · We'll model your project live
Trusted by 500+ solar companies across 12 countries
0%
Faster design time
0+
Solar companies
0 min
Avg. support response
0+
Countries served
One Address In. One Proposal Out.
Each step feeds directly into the next — no copy-paste, no re-entry, no dropped numbers.
Site & Address
AI roof model in 60 sec
Shading & Irradiance
P50/P75/P90 simulation
Panel Layout
Auto string sizing & BOM
Financial Model
NPV, IRR, payback, ROI
Branded Proposal
Client-ready in one click
Each step feeds the next automatically — the numbers you calculated in the tools are already built into this process.
What Happens When You Book
From booking to seeing your first project designed - the entire process takes less than 24 hours.
Book Your Slot
Fill out the form above - it takes 30 seconds. Our team responds within 1 business hour to confirm your demo time.
See SurgePV on Your Project
Share a project address and we'll model it live - AI roof detection, panel layout, shading analysis, and proposal generation in real time.
Start Designing Immediately
Get instant access to a free trial after your demo. Full platform, no restrictions, no credit card. Start closing more deals the same day.
Streamline Your Tools and Save Costs.
The individual calculators are free — and they're disconnected by design. SurgePV is what happens when all of it runs in sequence: roof model → shading → energy simulation → financial model → proposal. One platform, one price, no re-entry.
SurgePV - Everything in One Platform
AI roof modeling + shading analysis + energy simulation + financial modeling + branded proposals + BOM/SLD generation
Teams That Connected Their Workflow Never Looked Back
Hear from solar professionals who replaced disconnected tools with SurgePV after seeing it in action.
"We replaced three separate tools with SurgePV. Design time dropped from 4 hours to 45 minutes per project. The proposals look incredible - clients sign faster."
James Okafor
Lead Designer, SunTech Installations · Lagos
"The demo sold me in 10 minutes. Seeing our actual rooftop auto-modeled with panels, shading, and a full proposal - I saved $2,400/month by cancelling three subscriptions."
Mike Rodriguez
Owner, Lone Star Solar · Austin, TX
"Our team of 8 designers now completes 3x more projects per week. SurgePV's DEWA-compliant designs saved us from permit rejections - that alone paid for the platform."
Ahmed Hassan
Technical Director, Gulf Solar Solutions · Dubai
Questions About the Demo
How long is the demo?
A typical SurgePV demo takes 20–30 minutes. We walk you through AI roof modeling, shading analysis, proposal generation, and financial reporting - tailored to your project types and team size.
Do I need to prepare anything?
No preparation needed. However, if you have a recent project address or rooftop you'd like us to model live during the demo, share it when booking - we'll design it in real-time so you can see SurgePV on your actual project.
Is the demo personalized to my business?
Yes. We customize every demo based on your role (installer, EPC, developer), project types (residential, commercial, ground mount), and specific pain points. You'll see features most relevant to your workflow.
Can I get a free trial instead?
Absolutely. You can start a free trial right away - no credit card required. Many customers prefer to see a demo first so our team can show you the fastest way to get value from the platform.
What happens after the demo?
After your demo, you'll receive a free trial with full access to all features. Our team will also send you a personalized onboarding guide based on your workflow. There's no obligation - you decide if SurgePV is the right fit.
Design More. Sell More. Build More.
Join 500+ solar companies who replaced disconnected tools with one complete workflow — and never looked back.