Works Srl / Works Energy in Florence
16+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Works Srl / Works Energy
Soluzioni fotovoltaiche e ricarica veicoli elettrici a Firenze e in Toscana
Florence, Tuscany 50143
Florence, Tuscany 50143
Services Offered
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Works Srl / Works Energy!
Frequently Asked Questions
How do I get a quote from Works Srl / Works Energy?
You can request a quote through the form on this page or contact Works Srl / Works Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Works Srl / Works Energy serve?
Works Srl / Works Energy is based in Florence and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Works Srl / Works Energy hold?
This profile does not list independently verified certifications. Ask Works Srl / Works Energy for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Works Srl / Works Energy offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Works Srl / Works Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Works Srl / Works Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Works Srl / Works Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask Works Srl / Works Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Works Srl / Works Energy
Send your project details to request follow-up from Works Srl / Works Energy. Response timing and consultation terms are set by the company.
For Works Srl / Works Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Works Srl / Works Energy