Solar Installers in Oklahoma City, Oklahoma

10 Companies0 Reviews
AllResidentialCommercialIndustrial

Top Solar Installers in Oklahoma City

Profiles are listed alphabetically within their publication tier. Verify credentials and references directly.

AS
1

Astrawatt Solar

Est. 2016·Oklahoma City, Oklahoma·Reported 25yr warranty
SolarBattery

Reported credentials: NABCEP Certified PV Installation Professional · OSHA Certified · BBB A+ · SEIA Member

ES
2

EightTwenty Solar

Oklahoma City, Oklahoma·Reported 25yr warranty
SolarBattery

Reported credentials: Licensed Contractor (#095963)

GS
3

Global Solar Roofing & Construction

Oklahoma City, Oklahoma·Reported 25yr warranty
Solar

Reported credentials: BBB Accredited (since 2025)

IS
4

ION Solar

Est. 2013·Oklahoma City, Oklahoma·Reported 25yr warranty
SolarBattery

Reported credentials: NABCEP Certified · BBB A+

OG
5

Off Grid Enterprises

Est. 2014·Oklahoma City, Oklahoma·Reported 25yr warranty
SolarBattery

Reported credentials: NABCEP Certified · BBB Listed

OS
6

Okie Solar

Est. 2012·Oklahoma City, Oklahoma·Reported 25yr warranty
SolarBattery

Reported credentials: NABCEP Certified · BBB A+ · Enphase Certified Installer · SolarEdge Certified Installer

Axitec + Enphase

SS
7

Sage Solar Oklahoma

Est. 2002·Oklahoma City, Oklahoma·Reported 25yr warranty
Solar

Reported credentials: NABCEP Certified · BBB A+

SP
8

Solux Power

Oklahoma City, Oklahoma·Reported 25yr warranty
Solar
TS
9

Think Solar OKC

Est. 2010·Oklahoma City, Oklahoma·Reported 25yr warranty
Solar
TS
10

Tru-Fuse Solar

Est. 2014·Oklahoma City, Oklahoma·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: BBB A+ · Licensed Electricians

What Solar Costs in Oklahoma City

$2.50-$3.50

Cost per Watt

$20,000-$28,000

Typical 8kW System

8-12 yrs

Payback Period

$1,400-$2,400

Annual Savings (8kW)

Based on national averages. The 30% federal residential tax credit expired Dec 31, 2025. State and local incentives may reduce your net cost. Get quotes from multiple installers for accurate pricing.

How We Rank Solar Installers

Directory ordering uses currently published profile information. Ratings are withheld unless their source and verification can be documented.

Customer Reviews

Check current customer feedback on the original review platform and request recent references.

Certifications

NABCEP certification is the US gold standard. We also check state licensing and manufacturer certifications.

Track Record

Published profile fields help users compare companies. They do not constitute a quality score.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. Confirm licensing, certifications, active-trading status, references, and contract terms directly before hiring.

10

Published Profiles

0

Customer Reviews

Solar Installation in Oklahoma City, Oklahoma

Oklahoma City homeowners are investing in solar to reduce electricity bills and increase property value. A typical residential system generates 9,600-14,400 kWh per year, offsetting 80-100% of household electricity use depending on system size and roof orientation.

How to Choose an Installer in Oklahoma City

Start by checking NABCEP certification and Oklahoma state contractor licensing. Get at least three written quotes that include equipment specifications, total cost, expected annual production, and warranty terms. Compare not just price, but also equipment quality, warranty length, and the company's track record in Oklahoma City.

What to Expect

The process from signing a contract to turning on your system takes 6-12 weeks. Your installer handles design, permitting, installation (1-3 days), inspection, and utility interconnection. Once the utility grants Permission to Operate (PTO), your system goes live and starts generating savings.

More Cities in Oklahoma

Find solar installers in other Oklahoma cities

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation: Step by Step

1

Free Consultation

Contact an installer for a free site assessment. They'll evaluate your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, costs, available state incentives, and projected returns.

3

Permitting

Your installer handles building permits, HOA approvals, and utility interconnection applications.

4

Installation

Panels, inverter, and wiring are installed in 1-3 days. Followed by city inspection.

5

Permission to Operate

Utility grants PTO, system goes live, and you start generating clean energy.

Frequently Asked Questions

How much do solar panels cost in Oklahoma City?

Solar panel costs in Oklahoma City typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. Oklahoma state and local incentives, net metering, and SRECs may help reduce your net cost.

Who is the best solar installer in Oklahoma City?

The best solar installer in Oklahoma City depends on your needs, budget, and project type. Check ratings, reviews, certifications (NABCEP), and experience on this page. Get quotes from at least three installers to compare.

How long does solar installation take?

Physical installation takes 1-3 days. The full process from contract to Permission to Operate typically takes 6-12 weeks, including design, permitting, installation, inspection, and utility interconnection.

Do I need permits for solar panels?

Yes. Solar installations require building and electrical permits. Your installer handles all permitting, including HOA approval and utility interconnection. Some jurisdictions use SolarAPP+ for same-day automated approvals.

What solar incentives are available in Oklahoma City?

The 30% federal residential clean energy tax credit (ITC) expired on December 31, 2025. However, Oklahoma may offer state-level incentives such as rebates, performance-based incentives, or solar renewable energy certificates (SRECs). Net metering policies vary by utility - check with your local utility in Oklahoma City to see if they offer full retail credit for exported solar power. Your installer should walk you through all available incentives during the quoting process.

How much can I save with solar panels in Oklahoma City?

Savings depend on your electricity rate, system size, and sun exposure. A typical 8kW system offsets $1,400-$2,400 per year in electricity costs. Over 25 years, total savings typically range from $25,000-$50,000. Your installer can provide a detailed savings estimate based on your specific utility rate and energy usage.

Should I get battery storage with my solar panels?

Battery storage ($12,000-$18,000 installed) is worth considering if you have time-of-use electricity rates, experience frequent power outages, or want energy independence. Without favorable net metering, batteries help you use more of your own solar power instead of exporting it at lower rates. Popular options include Tesla Powerwall, Enphase IQ Battery, and Franklin WH.

What equipment should I look for?

Top-tier solar panels include REC, Q Cells, Canadian Solar, and Silfab. For inverters, Enphase microinverters (25-year warranty) and SolarEdge optimizers are the most popular. Your installer should offer multiple equipment options at different price points and explain the trade-offs.

Are You a Solar Installer in Oklahoma City?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.