Solar Installers in Michigan
Compare published solar company information across Michigan, verify credentials directly, and request quotes from local installers.
Find Solar Installers by City
Browse 2 cities in Michigan. Select a city to see local installers.
All Solar Installers in Michigan
20 solar companies across Michigan
Absolute Solar
Agathon Solar
Reported credentials: NABCEP · Tesla Certified
Silfab + Fronius
Harvest Solar
Reported credentials: NABCEP
SunPower
Helios Solar
Reported credentials: NABCEP · BBB A+ Rating
LightSkye Energy
Reported credentials: BBB Accredited
Q Cells + Enphase
Mechanical Energy Systems
Michigan Solar Solutions
Reported credentials: NABCEP · BBB A+ Rating
Solaria + SolarEdge
Mitten Solar Consultants
Reported credentials: BBB A+ Rating
North Coast Solar
Reported credentials: Solar Insure Certified · Pearl Certification · BBB A+ Rating
NovaTerra Energy
Quality Solar
Schoenherr Solar
Reported credentials: BBB Accredited (Roofing Division)
How We Rank Solar Installers
Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.
Customer Reviews
Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.
Certifications
NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.
Track Record
Published profile fields help users compare companies. These details are not a quality score and must be verified directly.
Why Trust the SurgePV Directory?
Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.
20
Published Profiles
0
Customer Reviews
Design Faster. Sell More.
SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.
60%
Faster project design
10 min
Full design turnaround
Frequently Asked Questions
How much do solar panels cost in Michigan?
Solar panel costs in Michigan typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.
What certifications should I look for?
NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Michigan state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.
What solar incentives are available in Michigan?
The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Michigan can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Michigan-specific incentives.
Are You a Solar Installer in Michigan?
List your company for free and connect with local customers looking for solar installation services.
List Your Company Free