Solar Installers in Georgia
Compare published solar company information across Georgia, verify credentials directly, and request quotes from local installers.
Find Solar Installers by City
Browse 2 cities in Georgia. Select a city to see local installers.
All Solar Installers in Georgia
20 solar companies across Georgia
Alpha Omega Construction Group
Reported credentials: Owens Corning Certified
Astrawatt Solar
Reported credentials: Tesla Powerwall Certified · Enphase Platinum Installer · BBB Accredited
REC + Enphase
Better Tomorrow Solar
Reported credentials: SEIA Member · SEPA Member · BBB Accredited
Coastal Roofworks
Reported credentials: BBB A- Rating
Coastal Solar Power
Reported credentials: Georgia Grown Member
Creative Solar USA
Reported credentials: NABCEP Certified PV Installation Professional · NABCEP Certified Technical Sales Professional · SEIA Member · GSEA Member
Custom Solar Solutions
Reported credentials: NABCEP Accredited · REC Pro Trust · Sol-Ark Platinum Installer · BBB Accredited
Qcells + Enphase
Elek Solar
Reported credentials: SEIA Member
Hannah Solar
Reported credentials: NABCEP · Licensed Master Electricians (GA, AL, MS, NC, SC, TN)
LowCo Roofing and Exteriors
Reported credentials: Savannah Chamber of Commerce Member
Lucent Energy
Tesla
Merica Solar Panels
How We Rank Solar Installers
Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.
Customer Reviews
Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.
Certifications
NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.
Track Record
Published profile fields help users compare companies. These details are not a quality score and must be verified directly.
Why Trust the SurgePV Directory?
Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.
20
Published Profiles
0
Customer Reviews
Design Faster. Sell More.
SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.
60%
Faster project design
10 min
Full design turnaround
Frequently Asked Questions
How much do solar panels cost in Georgia?
Solar panel costs in Georgia typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.
What certifications should I look for?
NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Georgia state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.
What solar incentives are available in Georgia?
The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Georgia can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Georgia-specific incentives.
Are You a Solar Installer in Georgia?
List your company for free and connect with local customers looking for solar installation services.
List Your Company Free