Back to SunPower by Freedom Solar
S
SunPower by Freedom Solar Reviews
Dallas, Texas
4.8
127 reviews
5 1
4 1
3 0
2 0
1 0
Write a Review
All Reviews (127)
Michael Torres Verified
Jun 10, 2026 Exceptional installation experience
SunPower by Freedom Solar installed our 12kW system in just two days. The crew was professional, cleaned up perfectly, and walked us through the app. Our electric bill dropped from $280 to $18 in the first month. Highly recommend!
Sarah Jenkins Verified
Jun 10, 2026 Great system, sales process was long
The panels are amazing and we are generating more power than expected. The only reason for 4 stars is that the sales process took longer than promised. Installation itself was flawless.