S

Sunerg Solar Energy S.r.l. in Perugia

Perugia, Umbria·Solar Installation
ResidentialCommercialIndustrial

48+ yrs

Experience

40 km

Service radius

51-200

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Sunerg Solar Energy S.r.l.

Produttore e installatore italiano di moduli fotovoltaici per residenziale, commerciale e industriale a Perugia dal 1978

Perugia, Umbria 06012

Perugia, Umbria 06012

Services Offered

Solar Installationsolar_consultationMaintenance

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Sunerg (produzione propria)

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Perugia, UmbriaCittà di Castello, UmbriaSan Giustino, UmbriaMonterchi, UmbriaSansepolcro, Umbria

Customer Reviews

No reviews yet. Be the first to review Sunerg Solar Energy S.r.l.!

Write a Review

Frequently Asked Questions

How do I get a quote from Sunerg Solar Energy S.r.l.?

You can request a quote through the form on this page or contact Sunerg Solar Energy S.r.l. directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sunerg Solar Energy S.r.l. serve?

Sunerg Solar Energy S.r.l. is based in Perugia and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sunerg Solar Energy S.r.l. hold?

This profile does not list independently verified certifications. Ask Sunerg Solar Energy S.r.l. for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Sunerg Solar Energy S.r.l. offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sunerg Solar Energy S.r.l. for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sunerg Solar Energy S.r.l. for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sunerg Solar Energy S.r.l. handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sunerg Solar Energy S.r.l. which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1978
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sunerg Solar Energy S.r.l.

Send your project details to request follow-up from Sunerg Solar Energy S.r.l.. Response timing and consultation terms are set by the company.

For Sunerg Solar Energy S.r.l.

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sunerg Solar Energy S.r.l.

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.