S

Sopim Energia in Rome

Rome, Lazio·Solar Installation
ResidentialCommercialIndustrial

22+ yrs

Experience

70 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Sopim Energia

Partner SunPower Elite per il fotovoltaico a Roma dal 2004

Rome, Lazio 00118

Rome, Lazio 00118

Services Offered

Solar InstallationBattery StorageEV Chargingsolar_consultationEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower Elite Partner

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPowerMaxeon

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

40yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Roma, LazioAprilia, LazioPomezia, LazioVelletri, LazioAlbano Laziale, Lazio

Customer Reviews

No reviews yet. Be the first to review Sopim Energia!

Write a Review

Frequently Asked Questions

How do I get a quote from Sopim Energia?

You can request a quote through the form on this page or contact Sopim Energia directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sopim Energia serve?

Sopim Energia is based in Rome and serves within a 70 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sopim Energia hold?

This profile lists the following reported certifications: SunPower Elite Partner. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Sopim Energia offer?

This profile reports 40-year panel coverage and 10-year workmanship coverage. Ask Sopim Energia for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sopim Energia for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sopim Energia handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sopim Energia which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2004
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sopim Energia

Send your project details to request follow-up from Sopim Energia. Response timing and consultation terms are set by the company.

For Sopim Energia

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sopim Energia

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.