R

Raising Power GmbH in Augsburg

Augsburg, Bavaria·Solar Installation
ResidentialCommercialIndustrial

11+ yrs

Experience

60 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Raising Power GmbH

Fachbetrieb für Photovoltaikanlagen und technische Betriebsführung in Augsburg

Augsburg, Bavaria 86157

Augsburg, Bavaria 86157

Services Offered

Solar InstallationBattery Storagesolar_consultationMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Augsburg, BavariaFriedberg, BavariaGersthofen, BavariaNeusäß, BavariaKönigsbrunn, Bavaria

Customer Reviews

No reviews yet. Be the first to review Raising Power GmbH!

Write a Review

Frequently Asked Questions

How do I get a quote from Raising Power GmbH?

You can request a quote through the form on this page or contact Raising Power GmbH directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Raising Power GmbH serve?

Raising Power GmbH is based in Augsburg and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Raising Power GmbH hold?

This profile does not list independently verified certifications. Ask Raising Power GmbH for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Raising Power GmbH offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Raising Power GmbH for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Raising Power GmbH for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Raising Power GmbH handle permits and paperwork?

The exact scope is not verified on this profile. Ask Raising Power GmbH which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Raising Power GmbH

Send your project details to request follow-up from Raising Power GmbH. Response timing and consultation terms are set by the company.

For Raising Power GmbH

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
R

Raising Power GmbH

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.