O

Omnianet Energy Srl in Turin

Turin, Piedmont·Solar Installation
ResidentialCommercial

42+ yrs

Experience

50 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Omnianet Energy Srl

Fotovoltaico e accumulo a Torino dal 1984 — professionalità e serietà al servizio dell'energia solare

Turin, Piedmont 10156

Turin, Piedmont 10156

Services Offered

Solar InstallationBattery Storagesolar_consultationMaintenance

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

SolarEdge

Batteries

LG Chem

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Torino, PiedmontSettimo Torinese, PiedmontSan Mauro Torinese, PiedmontChieri, PiedmontMoncalieri, Piedmont

Customer Reviews

No reviews yet. Be the first to review Omnianet Energy Srl!

Write a Review

Frequently Asked Questions

How do I get a quote from Omnianet Energy Srl?

You can request a quote through the form on this page or contact Omnianet Energy Srl directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Omnianet Energy Srl serve?

Omnianet Energy Srl is based in Turin and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Omnianet Energy Srl hold?

This profile does not list independently verified certifications. Ask Omnianet Energy Srl for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Omnianet Energy Srl offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Omnianet Energy Srl for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Omnianet Energy Srl for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Omnianet Energy Srl handle permits and paperwork?

The exact scope is not verified on this profile. Ask Omnianet Energy Srl which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1984
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Omnianet Energy Srl

Send your project details to request follow-up from Omnianet Energy Srl. Response timing and consultation terms are set by the company.

For Omnianet Energy Srl

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
O

Omnianet Energy Srl

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.